
TRANSFORMING LUBRICATION MANAGEMENT WITH INNOVATION
BRISBANE
KEY INFORMATION
CLIENT: EAST COAST LUBES
LOCATION: BRISBANE
SERVICE: VARIOUS LUBES
DURATION: 3 MONTHS
PROJECT MANAGER: DALE KNIGHT
PROJECT OVERVIEW
Nqpetro partnered with East Coast Lubes to conceptualise, construct, and commission an advanced system designed to enhance the efficiency of lubricant handling at their workshop in Brisbane. This cutting-edge system, powered by an Ebsray MD212 gear pump, represents a leap forward in reliability and operational efficiency.
KEY PROJECT HIGHLIGHTS:
Advanced Features: Our solution integrates state-of-the-art features tailored for precision and durability:
•Gauges for vacuum/pressure monitoring
•Thermal relief mechanisms
•Calibrated metering
•Air elimination functionalities
Each component is meticulously crafted and seamlessly integrated to ensure optimal performance in even the most demanding environments.
EXPERT INSTALLATION AND COMMISSIONING: During the commissioning phase, our skilled technicians demonstrated their expertise by installing tank stands fabricated to dumpy-level measurements, ensuring precise tank levelling. A specialised TRAP breather vent was also installed to safeguard against atmospheric water and condensation, preserving lubricant integrity.
PERFORMANCE VALIDATION: Through extensive testing, our system achieved impressive operational metrics:
•Unloading speeds of 450 litres per minute (LPM)
•Loading speeds of 400 LPM
These results showcase the efficiency and reliability of our solution, confirming its capability to meet rigorous operational demands.
PROJECT DELIVERY
The successful completion of this project with East Coast Lubes exemplifies our commitment to pushing boundaries and delivering unmatched solutions. As we celebrate this milestone, we reaffirm our dedication to driving innovation and excellence, empowering businesses to thrive in today’s dynamic market.