Skip to content

BP STAPYLTON'S UNDERGROUND PETROLEUM STORAGE SYSTEM OVERHAUL

QUEENSLAND

KEY INFORMATION

CLIENT: BP STAPYLTON

LOCATION: STAPYLTON, QLD

SERVICE: REMOVAL AND REPLACEMENT OF THE ENTIRE UNDERGROUND PETROLEUM STORAGE SYSTEM (UPSS)

DURATION: 12 WEEKS 

PROJECT MANAGER: ADAM CHAMPION

PROJECT OVERVIEW

Nqpetro is proud to announce the successful conclusion of the BP Stapylton Tank Replacement project, which involved the removal and replacement of the service station’s underground petroleum storage system (UPSS), bringing the site in line with modern regulations. This comprehensive upgrade encompassed civil demolition works, decommissioning of existing fuel infrastructure, sheet piling, fuel tank installation, forecourt capture system installation, underground fuel pipework installation, hazardous area electrical upgrades, and fuel equipment supply, installation, and commissioning.

KEY PROJECT HIGHLIGHTS:

REMOVAL AND REPLACEMENT OF EXISTING UNDERGROUND TANKS: We successfully removed and replaced four existing double-wall fibreglass tanks, upgrading the underground petroleum storage system (UPSS) at the service station to enhance safety and efficiency.

SHEET PILING FOR TANK FARM: Implemented sheet piling techniques to secure and reinforce the tank farm area, ensuring stability and safety during construction activities.

INSTALLATION OF CAR AND TRUCK CANOPY PIPEWORK: Efficiently installed pipework for car and truck canopies, facilitating seamless fuel delivery and enhancing customer experience at the service station.

HAZARDOUS AREA ELECTRICAL UPGRADES: Performed hazardous area electrical upgrades to ensure compliance with safety standards and regulations, prioritising site personnel's and customers' well-being.

INTEGRATION WITH EXISTING INFRASTRUCTURE: Successfully integrated new fuel pipework within existing conduit systems mounted under a suspended concrete slab, optimising space utilisation and minimising disruption to site operations.

PROJECT DELIVERY

Nqpetro successfully navigated the challenges of the BP Stapylton Tank Replacement project, executing the removal and replacement of the entire UPSS with precision and expertise. From demolishing existing infrastructure to installing and commissioning modern equipment, our team ensured seamless integration and adherence to the highest standards. This comprehensive upgrade has modernised the service station, making it safer and more efficient for future operations.

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

04 / ULP

On-site petrol supply

Keep petrol-powered vehicles and equipment fuelled on site with convenient unleaded petrol storage and dispensing.

Ideal for

Features

03 / GENERATOR SUPPLY

Fuel for temporary and standby power

Keep your generators fuelled through cyclone season, unexpected outages and temporary site operations, with diesel storage and connections suited to your setup.

Ideal for

Features

Available in 1,000L, 2,500L, 4,500L, 6,000L and 10,000L sizes.

02 / WASTE OIL

Waste oil storage for your site.

Collect and store waste oil from servicing and maintenance in a dedicated hire tank. 

Ideal for

Features

Standard drainage

An aluminium collection tray fitted beneath the tank lid.

Premium drainage

A larger aluminium collection tray with splashback protection, raised crash grates and a lower sieve filter for waste oil.

01 / DIESEL

On-site diesel supply

Keep vehicles, plant and machinery fielled on site. 

Ideal for

Features

Dispensing options

12V Package (85 L/min)
  • 12V PIUSI pump with a flow rate of 85 L/min.
  • Baldwin in-line filtration.
  • In-line check valve and Y-strainer.
  • 5 m delivery hose.
  • ZVA automatic shut-off nozzle with a nozzle holster.

Solar Power Upgrade

A turn-key solar and battery addition for the 12V Diesel Dispensing Package, including:

  • 120W, 12V solar panel, mounted to the tank hatch.
  • 20A solar regulator and solar connector kit.
  • 12V AGM battery, secured to a tank-mounted battery bracket.
  • On/off isolation switch and in-line fuses.
  • Complete wiring, fusing and switching, ready for use.
240V Package (72 L/m)
  • 240V, 1-inch pump with a flow rate of 72 L/min
  • Four-digit mechanical meter
  • In-line filtration and meter
  • Automatic shut-off nozzle with nozzle holster
  • 5m of 1-inch delivery hose